gardner-denver-transport-logo-500x250_Small.jpg

Access the Installation, Operation, and Maintenance Guide

Discover the comprehensive guide for the XK12, XK18 & TR20 SLIMLINE PACK 5 Cooling Package. This document provides detailed instructions, dimensions, and maintenance schedules to ensure efficient operation and upkeep of your equipment.

Document Sections

  1. About This Document: Purpose, scope, and audience of the guide.
  2. Warnings and Symbols: Safety precautions and symbols explained.
  3. General: Overview of product functionality.
  4. Available Packages: Details on XK12, XK18, and TR20 package options.
  5. Dimensions: Specifications for XK12, XK18, and TR20 models.
  6. Installation: Guidelines for setup, including lifting and mounting procedures.
  7. Changing Compressor Input Rotation: Instructions for XK12/18 and TR20 rotation adjustments.
  8. Air Inlet Connection: Steps for connecting the air inlet.
  9. Maintenance: Schedules, cleaning, and oil-changing procedures.
Gardner Denver Transport Pack 5 IOM Cover