To address the vehicle-size requirement, Gardner Denver UK incorporated its Highway & Utility driveline system into the existing technology and converted an existing
3.5-ton GVW van. The resulting compact utility vehicle can provide the pneumatic power required for
fibre blowing while also producing hydraulic and electrical power.
Pneumatic power for fibre installation
Once an underground duct has been cleared, compressed air is used to blow fibre optic cable through the duct for distances of up to 1 km. Pneumatic power can also operate a duct motor capable of pulling cable or feed wire through the duct.
Hydraulic power for cable and duct work
The hydraulic system supplies power to a winch used to pull old cable from underground ducts. A rodding machine can then clear the duct in preparation for new cable.Hydraulic power can also operate various hand tools required by field teams.
Electrical power for field operations
An onboard alternator provides electrical power for equipment including:
- Fusion welding equipment
- Water pumps for clearing flooded manholes
- Emergency work lights
- Other onboard electrical equipment
Together, these systems provide a multi-function vehicle platform for fibre installation and utility operations.
Winch Safety and Load Monitoring
During discussions about the project, British Telecom identified issues with ropes breaking during winching operations because operators lacked an indication of the tension being applied.Gardner Denver Engineering and Electronics developed a load-cell-based measuring device to address the problem. The system digitally displays pulling force and sends a signal to stop the winch when maximum pull is reached.The monitoring unit is solar powered. Following development of the solution, British Telecom ordered units to accompany its cabling vehicles. Further discussions about the reliability of existing winches also led to an additional order for new winches.